SOLSolution
50 Hz · 380–415 V (3-phase) · CIF Jebel Ali (or FOB Nhava Sheva)
Side Channel Blower for Effluent Treatment Plants in Middle East
Side Channel Blower sized for activated-sludge and SBR aeration on variable industrial load — 150–1,100 m³/hr at 250–650 mbar — and built for the Middle East grid, climate and shipping route.
Side Channel Blower demand for effluent treatment in Middle East is real and growing; the engineering question is only whether the machine holds its pressure through local conditions and arrives without a three-month lead time. Effluent Treatment Plants means activated-sludge and SBR aeration on variable industrial load — plan for 150–1,100 m³/hr and 250–650 mbar, and pick the smallest model that covers both.
Motors are de-rated for 45–50 °C ambient and coastal corrosion protection is specified where the site sits near the sea. The supply is 50 Hz at 380–415 V (3-phase), and shipment is CIF Jebel Ali (or FOB Nhava Sheva). The models to look at are YEBL-1-270, YEBL-1-400, YEBL-1-530; the sizing table and spec figures below get you into the right ballpark before you ask for a quotation.
MDLRecommended models
Side Channel Blower — the fit for effluent treatment
Equalization-tank mixing and shallow aeration up to ~2 m deep — clean air for continuous or SBR duty on small-to-mid ETPs.
| Model | Power | Flow (m³/hr) | Flow (CFM) | Vacuum (mbar) | Pressure (mbar) | Noise (dB) | Weight (kg) |
|---|---|---|---|---|---|---|---|
| YEBL-1-270 | 3.0 HP | 270 | 158 | -230 | 250 | 67 | 27 |
| YEBL-1-400 | 5.0 HP | 400 | 235 | -290 | 330 | 77 | 40 |
| YEBL-1-530 | 7.5 HP | 530 | 312 | -300 | 320 | 80 | 62 |
Match discharge pressure to tank depth and diffuser resistance; a PRV caps back-pressure through settle and decant phases. Indicative only — final selection depends on your exact duty point, altitude and air temperature.
EXPBuilding for Middle East
- Frequency
- 50 Hz
- Three-phase voltage
- 380–415 V (3-phase)
- Single-phase
- 220–240 V
- Incoterms
- CIF Jebel Ali (or FOB Nhava Sheva)
- Ports
- Jebel Ali · Dammam · Jeddah · Hamad · Sohar
- HS code
- 8414 — air/gas blowers, fans & compressors
Motors are de-rated for 45–50 °C ambient and coastal corrosion protection is specified where the site sits near the sea.
Sewage & STP aeration
Continuous diffused-air aeration for sewage treatment plants across new urban districts — the single biggest blower pull in the region.
Desalination & water treatment support
Aeration, degassing and pneumatic duty supporting desalination and municipal water treatment plants along the coast.
Aquaculture
Diffused-air aeration for a growing Gulf aquaculture sector holding dissolved oxygen in intensive ponds and tanks.
Construction & cement
Pneumatic conveying and dust-handling for construction and cement plants — inlet filtration specified against fine abrasive dust; also serves oilfield-adjacent utility duty.
FAQSide Channel Blower for Effluent Treatment Plants — FAQs
What about spares and lead time for a Middle East order?
Yash casts impellers and makes filters and pressure-relief valves in-house, so the spare you need in two years is the same part on the same drawing. For Middle East that means a predictable chain — fast movers held regionally, the rest by air freight — and a firm lead time confirmed with the quote. Ask for a spares package matched to your duty cycle.
Will the Side Channel Blower run on Middle East power?
Yes. Units for Middle East are wound for 50 Hz at 380–415 V (3-phase), so the machine hits its rated duty point on your supply without a frequency conversion. Motors are de-rated for 45–50 °C ambient and coastal corrosion protection is specified where the site sits near the sea. Confirm your exact site voltage and phase on the enquiry and the build is matched to it.
RFQ / Request for Quotation
Side Channel Blower for Effluent Treatment Plants in Middle East?
Send your duty point (150–1,100 m³/hr at 250–650 mbar), site voltage and destination port — an engineer sizes the model and quotes CIF Jebel Ali (or FOB Nhava Sheva).