Scaling without an import wait
A fast-growing food-and-herbal manufacturer adds lines quickly, and each new line needs vacuum and air on its own schedule. The constraint that bites is lead time on the machine and, later, on spares. Sourcing from a domestic works that dispatches in volume means a second packing pump or a replacement aeration blower is weeks, not months, and a rebuild does not wait on a container. Standardising on one family across similar lines also means one set of spares covers many machines — a real advantage when the plant is still growing.
