Skip to content
Yash BlowersYash Blowers

SOLSolution

50 Hz · 380–415 V (3-phase) · CIF Mombasa / Durban / Lagos (or FOB Nhava Sheva)

Double Stage Blower for Sewage Treatment Plants in Africa

Double Stage Blower sized for continuous 24/7 fine-bubble diffused aeration — 200–2,000 m³/hr at 300–600 mbar — and built for the Africa grid, climate and shipping route.

When a sewage treatment contractor in Africa asks Yash for a double stage blower, the quotation starts from the duty point and the 50 Hz supply — never from a catalogue number picked by guesswork. Get the sewage treatment sizing right and the rest is easy: the duty is continuous 24/7 fine-bubble diffused aeration, the window is 200–2,000 m³/hr / 300–600 mbar, and Pressure follows basin depth at roughly 100 mbar per metre; airflow follows the BOD load. Hold dissolved oxygen at 1.5–2.5 mg/L.

The Africa build is specified for 50 Hz / 380–415 V (3-phase) and ships CIF Mombasa / Durban / Lagos (or FOB Nhava Sheva) via Mombasa. Genset-ready builds for unstable grid power, robust filtration for dust and heat, and an in-house spares pipeline for remote sites. The recommended models are YEBL-DS-320V, YEBL-DS-520, YEBL-DS-900; each is dynamically balanced for the continuous duty sewage treatment runs, and each ships with test certificates on request.

MDLRecommended models

Double Stage Blower — the fit for sewage treatment

Double Stage Turbine Blower

Two stacked impellers hold the 400–500 mbar-plus head that deeper 4–5 m municipal aeration basins demand against the water column.

Recommended Double Stage Turbine Blower models for this duty
ModelPowerFlow (m³/hr)Flow (CFM)Vacuum (mbar)Pressure (mbar)Noise (dB)Weight (kg)
YEBL-DS-320V7.5 HP320188-4405007370
YEBL-DS-52015.0 HP520317-43066074123
YEBL-DS-90015.0 HP900529-28037074110

Pressure follows basin depth at roughly 100 mbar per metre; airflow follows the BOD load. Hold dissolved oxygen at 1.5–2.5 mg/L. Indicative only — final selection depends on your exact duty point, altitude and air temperature.

EXPBuilding for Africa

Frequency
50 Hz
Three-phase voltage
380–415 V (3-phase)
Incoterms
CIF Mombasa / Durban / Lagos (or FOB Nhava Sheva)
Ports
Mombasa · Dar es Salaam · Durban · Lagos · Tema
HS code
8414 — air/gas blowers, fans & compressors

Genset-ready builds for unstable grid power, robust filtration for dust and heat, and an in-house spares pipeline for remote sites.

Aquaculture

Diffused-air aeration for intensive tilapia, catfish and shrimp systems — holds dissolved oxygen in ponds, tanks and raceways across a fast-growing sector.

Mining & cement dust collection

Pressure and vacuum for pulse-jet baghouses and cartridge filters at crushers, transfer points, screens and bagging lines.

Municipal wastewater

Continuous aeration-basin and diffuser duty at treatment plants as cities grow and effluent rules tighten — 24/7 rated machines.

Agriculture & food processing

Grain aeration, drying, and pneumatic conveying of flour, feed and granules in processing and packing lines.

FAQDouble Stage Blower for Sewage Treatment Plants — FAQs

Which Double Stage Blower model do I need for sewage treatment in Africa?

For a typical sewage treatment duty of 200–2,000 m³/hr at 300–600 mbar, start with YEBL-DS-320V and step through YEBL-DS-320V, YEBL-DS-520, YEBL-DS-900 as the load rises. Pressure follows basin depth at roughly 100 mbar per metre; airflow follows the BOD load. Hold dissolved oxygen at 1.5–2.5 mg/L. Send us your exact flow and pressure and an engineer confirms the model and quotes it CIF Mombasa / Durban / Lagos (or FOB Nhava Sheva).

How do you ship a Double Stage Blower to Africa?

Orders move CIF Mombasa / Durban / Lagos (or FOB Nhava Sheva), routed through Mombasa. Units are palletised and packed in seaworthy, ISPM-15 heat-treated wooden crates and declared under HS heading 8414. Commercial documents, certificate of origin and per-unit test certificates travel with the shipment on request; spares can follow by air freight.

RFQ / Request for Quotation

Double Stage Blower for Sewage Treatment Plants in Africa?

Send your duty point (200–2,000 m³/hr at 300–600 mbar), site voltage and destination port — an engineer sizes the model and quotes CIF Mombasa / Durban / Lagos (or FOB Nhava Sheva).

WhatsApp